-
Cyient at NECX 2026!Nuclear power plant engineering:
Design-to-deploymentAugust 24 -27, 2026
Hilton Anatole, Dallas, TX
Booth No: #453
Schedule adherence in design & deployment with Cyient
Nuclear renaissance is happening in multi-dimension globally. SMRs and Gen-IV reactors of different technologies are revolutionizing nuclear reactor design & analysis, and deployment space. Flexibility in technology adoption and scaling of engineering capacity is key to meet the budget and schedule to make the program successful for an OEM or power plant owner. NECX 2026 brings the entire nuclear fraternity into one room to talk about getting real projects designed/built successfully under the triple constraints, and that's exactly the conversation we came for.
It's also where Cyient does its best work - across the design-to-deployment of reactor technologies, not just the headline scope. From new builds and SMRs to advanced reactors -, we bring deep nuclear power plant engineering expertise together with digital engineering so owners, OEMs, and EPCs can hold their budget, schedules, keep documentation clean and continuous, and get every system aligned before the first module ships.
Expected delivery advantages with Cyient
Keep programs moving without late-stage surprises
Plan engineering readiness early at a site across structural, mechanical, piping, I&C, in both nuclear island and balance-of-plant (BoP) workstreams -so teams can identify gaps before they affect construction, commissioning, or operations.
Reduce rework across the NPP lifecycle
Maintain continuity from feasibility and design through operations, asset management, life extension, and decommissioning with engineering support that follows the program instead of stopping at handover.
Strengthen documentation and handover readiness
Keep as-built records, regulatory documentation, commissioning inputs, and configuration data aligned -helping teams avoid delays caused by missing, outdated, or disconnected information.
Make engineering data decision-ready
Connect digital engineering, systems integration, system operating performance optimization and cross-discipline co-ordination so teams have the visibility they need to make faster, better-informed decisions across complex nuclear programs.
Cyient's fitment in your nuclear roadmap
|
New builds |
Site engineering for base reactor design adoption, Site design and engineering documentation and configuration management, readiness into the program early, with multi-discipline engineering support that helps reduce deployment risk. |
|
SMRs and advanced reactors |
Support design and deployment readiness through systems integration, documentation continuity, and scalable engineering execution. |
|
Operating fleets |
Support reliability, obsolescence management, life extension support, asset integrity, performance optimization and engineering change management across live plant environments. |
Don't leave NECX with just brochures, leave with a proven NPP engineering partner, who can deliver.
At Booth #453, Cyient's nuclear power plant engineering team will help you pressure-test real program challenges - design and analysis regulatory licensing, BOP dependency, documentation gap, configuration issue, handover risk, or digital continuity in deployment phase.
Come with a milestone, concern, or workstream you are trying to de-risk. Walk away with a clearer view of:
-
Global delivery models from low-cost geographies
-
Delivery risks and mitigation plans
-
Digitizing engineering controls needing attention
-
NPP thermal performance optimization using digital technologies
-
Best practices to reduce rework and delivery slippages
-
Best practices for documentation and handover readiness
Grab a slot with our team and let's talk through the real engineering choices behind new builds, life extension, SMRs, and advanced reactors.
Meet our experts
Sivaganesh Paramasivam
Senior Delivery Director – Nuclear, Energy BU
Sivaganesh.Paramasivam@cyient.com