Partnering with Bombardier Transportation to Successfully Deliver the Elizabeth Line Project

Partnering with Bombardier Transportation to Successfully Deliver the Elizabeth Line Project
The technical complexity of a rolling stock project coupled with short delivery timelines can pose a big challenge even for the most experienced players in the industry. Also, if the client is also committed to delivering a parallel undertaking, the matters can get highly complex. When Bombardier Transportation, a leading rail technology company faced this challenge, Cyient played a key role as a trusted engineering partner contributing to about 25% of the engineering effort toward developing the train cars for London Crossrail project. We facilitated the development of train cars and also contributed to sub-system engineering and testing of train control management. The technical methodologies employed in this project and benefits ensured have been heralded as benchmarks for such works in the railway industry. Discover how we contributed to the success of the Elizabeth Line project for Crossrail by downloading the case study here.
Download the Case Study
I agree that I will not use this content for media/journalism purposes without prior written consent from Cyient and its clients.

Receive communication from Cyient