At Vaskiluoto, EPV Energia and Vaasan Voima set out to increase the capacity of two former oil-storage caverns already repurposed for thermal energy storage. The challenge was to raise storage temperatures above 100 °C while integrating the upgraded system with existing district heating, electric boilers, and CHP infrastructure. Cyient delivered multidisciplinary concept-to-detail engineering, including water-column pressurization to enable operation at up to 130 °C, a new pumping and heat-exchange system, redesigned district-heating operations, and regulatory deliverables.
The upgraded system increased thermal energy storage capacity to approximately 17 GWh and doubled charging and discharging capacity to approximately 220 MW. With 220 MW of electric boiler capacity, surplus renewable electricity can now be converted into heat, stored over extended periods, and released during peak demand. The integrated system gives EPV greater energy flexibility while reducing reliance on combustion-based heat production.